Bid No. 1718-3006R-3

PERFORMING ARTS AND CULTURAL CENTER

Status

Bidding Closed

Bid Date7/31/18 1:00 pm

Company & Contacts

Southwestern College

Doug Beckman   doug.beckman@rsconst.com

Location

900 Otay Lakes Road, Chula Vista, CA, 91910

NOTICE IS HEREBY GIVEN that Southwestern Community College District of San Diego
County, California, acting by and through its Governing Board, hereinafter referred to as the
“DISTRICT” will receive up to, but no later than 1:00 P.M. on July 31, 2018 sealed Bid No.
1718-3006R-3, for the award of a contract for the Performing Arts & Cultural Center Project
for the following bid packages:

BP 07 – Masonry
*BP 13 – Doors, Frames, & Hardware
BP 20 – Resilient Flooring

*Note: Bid Package 13 – Doors, Frames, & Hardware is only available for bidding to
contractors that were previously prequalified, and is subject to the Community Benefits Agreement (CBA) adopted by the District on December 12, 2013. The complete agreement is available for viewing and downloading at http://www.swccd.edu/Modules/ShowDocument.aspx?documentid=7910. Minority, women, and disabled veteran contractors are encouraged to submit bids.
Please note bid packages 7 and 20 are exempt from the CBA requirement and
prequalification.

Bids shall be addressed to Mark Claussen, Proposition R and Z Program Manager Building
1688 located at 900 Otay Lakes Road, Chula Vista, CA 91910, and shall be opened in a location to be announced at the bid submission on the date and at the time listed above.

Each bidder shall be a licensed contractor pursuant to the California Business and Professions
Code Section 7028.15 and Public Contract Code Section 3300, and shall be licensed in the
following classification as required by the scope of work required in the above called out bid
packages:

BP – License
BP 07 – Masonry C29
BP 13 – Doors, Frames, & Hardware B, C6, C28, or D28
BP 20 – Resilient Flooring B, C15, C33, or D12

There will be no pre-bid conference for Bid Phase 3.

Prospective bidders MAY NOT re-visit the Project Site without making arrangements through
the Construction Manager (Rudolph and Sletten – Cade McMullin, Project Executive).
Pursuant to Public Contract Code Section 3400©, if the District has made any findings
designating certain materials, products, things, or services by specific brand or trade name,
such findings and the materials, products, things, or services and their specific brand or trade
names will be set forth in the Special Conditions.

All questions concerning this bid should be sent to Doug Beckman at
doug.beckman@rsconst.com. All questions to be submitted on Exhibit 2G – Pre-Bid Document
Clarification (PBDC) form. The final day for questions shall be July 19, 2018 no later than 2
p.m.

Bid documents will be available week of: July 13, 2018.

Dated this:
July 12, 2018.